PROJECT DESCRIPTION

Sewer Authorities in Victoria are now 3 years in front of the rest of Australia. All thanks to their forward thinking drainage engineers. Largely it is the Victorian developers who take on the cost for abandoned property branch cut and seals. But not by an excavator but rather the installation of a stainless steel internal clip positioned inside the retic branch. This method is fast and economical, performed only by an approved live sewer water authority contractor with a CCTV unit and a pneumatic installation trolley packer. This simple, no fuss trenchless installation safe guards accidental concrete engulfment’s into the sewer retic network. A cut and seal can accidentally be dislodged or even be clipped by an auger excavating foundations tight on an easement boundary. There are many incidents on record of new drainage alignments being required due to cured concrete in the sewer retic line. Sometimes this can from one manhole to the next manhole.

 

PROJECT DETAILS

Project: Various installations throughout the
Melbourne sewer network.
End User:Available on DN150mm & DN225mm
Contractor:Accredited Live sewer contractors
only
Country:Australia
Construction area:MRWA : Melbourne Retail Water
Agencies
Installation period:2019 - present
Area of application:Internal clip to sewer junction
Number of seals:100+
Nominal DN (mm):150-225mm
Challenge:Intrusions and large JDR’S

View more case studies from Smart Lock

When you need a solution to work, lock in Smart Lock.

Find out more

WHO CAN INSTALL SMART LOCK?
WHY DOES SMART LOCK SAVE MONEY?
WHERE IS A SMART LOCK SUITED TO?