INSTALLING SMART LOCK
Just load, lock
and leave.
Load the prepared Smart Lock sleeve onto the trolley, lock in place at the desired location, deflate the trolley and leave.

Load the prepared Smart Lock sleeve onto the trolley, lock in place at the desired location, Deflate the trolley and leave.
INSTALLATION IS SIMPLE.
After the successful completion of the accredited training, you will fully benefit from a simple installation procedure. Simple measurements and smart equipment that is user friendly.
LOAD IT UP.
Onto the installation packer the Smart Lock goes. With a marked tag line, the Smart Lock is rolled up the pipe until the correct position is achieved. This can be acheived by the pushing or pulling the pecker via ropes or rods.
LOCK INTO PLACE.
After confirming the final position air equipment is used to inflate the trolley bladder to set the Smart Lock securely into the pipe. This simple action is permanent and concludes the install.
LEAVE TO THE NEXT JOB.
Free now to install additional Smart Lock sleeves or pack up and go onto the next job. With a Smart Lock point rehabilitation sleeve you do not need to stop and wait for any resin curing time. Simply deflate packer and leave.
Installation can only be performed by trained and accredited businesses and individuals. Smart Lock will train approved contractors in the technical and practical aspects of the installation of a Smart Lock to ensure that the 100 year design life is guaranteed.
If you are interested in becoming an accredited installer, or are interested in locating someone to install a Smart Lock for you, please contact us using our contact form and we will put you in touch.
Subscribe to the Smart Lock newsletter
to keep up to date with the latest news
and additions to the product range.